Sunday 16 November 2014

SS-23 ongoing

Well it looks like Miniman are not going to send the missing suspension parts (it's been nearly a month) so I've had to make my own as time is moving on;


Starting of with styrene sheet a 10mm x 20mm piece was cut out then cuts were made part way through either side and gently bent to make the shape. To get the width of material for the top and bottom three strips of 0.060 (1.25mm) styrene were glued together like a laminate and when fully cured the anchor points for the top and bottom were made.
These are still drying so when they are ready I will cut a hole in the middle for the axle to go through.
They are not the best but they are needed to fix the axle to the suspension assembly and will be mostly hidden by the wheels anyway. The next thing to make are eight suspension struts, add the missing steering linkages, air tanks for the brake system and associated cabling. This ain't going to be finished this side of xmas for definite.

No comments:

Post a Comment